Backlog — index
What each open backlog item is, in one line. 1PRIORITY.md says what to
do next. INVESTIGATEs stay here until every child PLAN ships; PLANs live in active/ while
in progress.
| Item | What it does | Priority |
|---|---|---|
| PLAN-host-installer-handover | DCT's side of the host-installer split: host requirements page, admin-free callable install.ps1/install.sh, plain-language handover | High |
| PLAN-finish-move-to-helpers-no | Leftovers of the terchris → helpers-no move: fork network reversed, old image deleted (phases 1–2 done) | — |
| INVESTIGATE-outdated-software-versions | Decide how the base image pins or tracks Node and other bundled software versions | — |
| INVESTIGATE-image-retention | Retention policy for the image tags every release pushes to ghcr.io | — |
| PLAN-windows-testing | Validate DCT on Windows; it has only been tested on macOS | — |
| INVESTIGATE-kubeconfig-in-devcontainer | Make kubectl inside the container reach the host's clusters | — |
| INVESTIGATE-git-identity-auto-detect | Pick up the host's git identity on first container start | — |
| INVESTIGATE-host-identity-and-template-defaults | Capture host identity once and use it as template defaults | — |
| INVESTIGATE-otel-auto-identity | Auto-detect the developer identity fields OTel telemetry needs | — |
| INVESTIGATE-simplify-initial-dct-experience | Reduce what a new user has to take in on first open | — |
| INVESTIGATE-dev-setup-direct-command | Let dev-setup run a named script directly instead of only via the menu | — |
| INVESTIGATE-template-quickstart-block | A quickstart block in template-info.yaml for the post-install message | — |
| INVESTIGATE-php-install-scripts | Split plain PHP from the Laravel install script and fix its instructions | — |
| INVESTIGATE-advanced-templates | Templates with backend dependencies (for example a CMS plus PostgreSQL) | — |
| INVESTIGATE-analytics-setup | Umami analytics for the documentation site; definition incomplete | — |
Priority is unset except where marked: no ranking of the rest of the backlog has been agreed yet.