Skip to main content

Creating Plans

How to structure plans for AI-assisted development.


Folder Structure​

website/docs/ai-development/ai-developer/plans/
├── backlog/ # Approved plans waiting for implementation
├── active/ # Currently being worked on (max 1-2 at a time)
└── completed/ # Done - kept for reference

Flow​

Idea/Problem → PLAN file in backlog/ → active/ → completed/
↓
(or INVESTIGATE file first if unclear)

File Types​

PLAN-*.md​

For work that is ready to implement. The scope is clear, the approach is known.

When to create:

  • Bug fix with known solution
  • Feature request with clear requirements
  • Refactoring with defined scope

Naming: PLAN-<short-name>.md

Examples:

  • PLAN-docker-path-fix.md
  • PLAN-add-drawio-extension.md

INVESTIGATE-*.md​

For work that needs research first. The problem exists but the solution is unclear.

When to create:

  • Complex refactoring where options need evaluation
  • Bug with unknown root cause
  • Feature requiring design decisions

Naming: INVESTIGATE-<topic>.md

Examples:

  • INVESTIGATE-prerequisite-enforcement.md
  • INVESTIGATE-monitoring-architecture.md

After investigation: Create one or more PLAN files with the chosen approach.


Plan Structure​

Every plan has these sections:

1. Header (Required)​

# Plan Title

## Status: Backlog | Active | Blocked | Completed

**Goal**: One sentence describing what this achieves.

**Last Updated**: 2026-01-14

2. Problem Summary (Required)​

What's wrong or what's needed. Be specific.

3. Phases with Tasks (Required)​

Break work into phases. Each phase has:

  • Numbered tasks
  • A validation step at the end
## Phase 1: Setup

### Tasks

- [ ] 1.1 Create the config file
- [ ] 1.2 Add validation rules
- [ ] 1.3 Test with sample data

### Validation

User confirms phase is complete.

---

## Phase 2: Implementation

### Tasks

- [ ] 2.1 Update the install script
- [ ] 2.2 Add to enabled-tools.conf
- [ ] 2.3 Test install/uninstall

### Validation

User confirms install/uninstall works correctly.

4. Acceptance Criteria (Required)​

## Acceptance Criteria

- [ ] Feature works in devcontainer
- [ ] Install script runs without errors
- [ ] Uninstall script cleans up properly
- [ ] No shellcheck warnings

5. Files to Modify (Optional but helpful)​

## Files to Modify

- `.devcontainer/additions/install-xyz.sh`
- `.devcontainer.extend/enabled-tools.conf`

Status Values​

StatusMeaningLocation
BacklogApproved, waiting to startbacklog/
ActiveCurrently being worked onactive/
BlockedWaiting on something elsebacklog/ or active/
CompletedDonecompleted/

Updating Plans During Implementation​

important

Plans are living documents. Update them as you work.

When starting a phase:​

## Phase 2: Implementation — IN PROGRESS

When completing a task:​

- [x] 2.1 Update the template ✓
- [ ] 2.2 Fix the CSS

When a phase is done:​

## Phase 2: Implementation — ✅ DONE

When blocked:​

## Status: Blocked

**Blocked by**: Waiting for decision on approach

When complete:​

  1. Update status: ## Status: Completed
  2. Add completion date: **Completed**: 2026-01-14
  3. Move file to completed/

Plan Templates​

Simple Bug Fix​

# Fix: [Bug Description]

## Status: Backlog

**Goal**: [One sentence]

**Last Updated**: YYYY-MM-DD

---

## Problem

[What's broken]

## Solution

[How to fix it]

---

## Phase 1: Fix

### Tasks

- [ ] 1.1 [Specific change]
- [ ] 1.2 [Another change]

### Validation

User confirms fix is correct.

---

## Acceptance Criteria

- [ ] Bug is fixed
- [ ] No regressions
- [ ] Scripts pass shellcheck

Feature Implementation​

# Feature: [Feature Name]

## Status: Backlog

**Goal**: [One sentence]

**Last Updated**: YYYY-MM-DD

---

## Overview

[What this feature does and why]

---

## Phase 1: [Setup/Preparation]

### Tasks

- [ ] 1.1 [Task]
- [ ] 1.2 [Task]

### Validation

User confirms phase is complete.

---

## Phase 2: [Core Implementation]

### Tasks

- [ ] 2.1 [Task]
- [ ] 2.2 [Task]

### Validation

User confirms phase is complete.

---

## Acceptance Criteria

- [ ] [Criterion]
- [ ] Install works
- [ ] Uninstall works
- [ ] Scripts pass shellcheck

---

## Files to Modify

- `.devcontainer/additions/install-xyz.sh`

Investigation​

# Investigate: [Topic]

## Status: Backlog

**Goal**: Determine the best approach for [topic]

**Last Updated**: YYYY-MM-DD

---

## Questions to Answer

1. [Question 1]
2. [Question 2]

---

## Current State

[What exists now]

---

## Options

### Option A: [Name]

**Pros:**
-

**Cons:**
-

### Option B: [Name]

**Pros:**
-

**Cons:**
-

---

## Recommendation

[After investigation, what do we do?]

---

## Next Steps

- [ ] Create PLAN-xyz.md with chosen approach

Best Practices​

  1. One active plan at a time - finish before starting another
  2. Small phases - easier to validate and recover from errors
  3. Specific tasks - "Update line 42 in file.sh" not "Fix the thing"
  4. Runnable validation - commands, not descriptions
  5. Update as you go - the plan is the source of truth
  6. Keep completed plans - they're documentation